<img height="1" width="1" style="display:none;" alt="" src="https://px.ads.linkedin.com/collect/?pid=199364&amp;fmt=gif">
Skip to the main content.

1 min read

First ILI without operational impact

First ILI without operational impact

Jee project managed the pre-ILI cleaning, gauging and in-line inspection of a critical main oil pipeline onshore in Central Africa which exports crude oil foe several operators.

The pipeline had been inspected previously; however, pigging had always led to operational issues, including outages. For this ILI, Jee were approached because of our reputation in managing and assuring pigging projects with a track record of minimising operational and technical risk.

Jee managed the project from tool and vendor selection to the in-country onshore execution, providing technical oversight during the campaign. Despite the historic challenges, Jee, though our rigorous in-house project scheduling, risk management and assurance procedures, successfully completed the ILI without any operational impact. This was a critical KPI that was successfully met.

Jee now provides project management and technical assurance support to all the client’s in-line inspection projects.

For more information, visit www.jee.co.uk/project-management

To contact Sean Tucker, email sean.tucker@jee.co.uk, or call +44 (0)1732 371 371.