Pipelines can operate safely beyond their original design life—but only with rigorous integrity monitoring and timely maintenance. Over time, critical components such as isolation valves can deteriorate, impacting essential operations like pigging and increasing safety risks. Replacing these components often requires complex engineering and precise execution.
Our client faced this challenge during an equipment changeout programme involving three interlinked pipelines, including a critical export line with third-party entrants. The scope required three high-pressure isolation tools and seamless coordination across multiple stakeholders.
The client turned to Jee for our proven expertise in pipeline plugging and project management. We provided:
Our involvement covered the full lifecycle:
With Jee’s support, the project was delivered safely, on time, and without disruption. Key benefits included:
This project demonstrates how expert technical assurance combined with robust project management can deliver complex pipeline interventions efficiently—protecting production, safety, and long-term asset value.
For more information, visit www.jee.co.uk/project-management
To contact our Head of Pigging, Sean Tucker, email sean.tucker@jee.co.uk, or call +44 (0)1732 371 371.